Exam Code : 76940X
Exam Name : Avaya Converged Platform Support
Vendor Name :
"Avaya"
76940X Dumps 76940X Braindumps 76940X Real Questions 76940X Practice Test
76940X Actual Questions
killexams.com Avaya 76940X
Avaya Converged Platform Support
https://killexams.com/pass4sure/exam-detail/76940X
What should the engineer do with Virtual Machine snapshots that were created during the upgrade process?
The VM snapshots should be backed up to external storage and deleted immediately.
The VM snapshots should be deleted immediately.
The VM snapshots should be deleted within 72 hours of the verified, successful completion of the upgrade process.
The VM snapshots should be left as they are as a backup of the upgrade process.
Which two files should the engineer use? (Choose two.)
hp-firmware-ilo4-2.60-1.1.i386.rpm
bp-avaya-dl360g9-g10-ACP-4_0-New-only.iso
SP99382.exe
ACP_40_ilo4_261.bin
Reference: https://support.avaya.com/downloads/download-details.action?contentId=C201811141048316790_5&productId=P1704
A customer requires additional Avaya Aura® applications to be added to the ACP 4200. This has been reviewed and approved by Avaya's ACP Product Management team. It has been determined that a new computer server is required to meet the expanded resource requirement.
Which three parts of the Lifecycle Workbook need to be updated to provide for the new requirements? (Choose three.)
Contact Info
ACP 4200 Solution RMU Elevation
Serial Numbers
Network Data
QA Checklist
Which IP address should be used for the Network 1 IP Address?
The Localhost IP address for your datacenter subnet IP interface
The datacenter facing IP interface IP address and a 32 bit mask
The Internet facing IP interface IP address and mask
A temporary IP, from the Management subnet, not already in use
To provide for this replacement, which portion of the Lifecycle Workbook needs to be updated?
Power Cord Wiring
Serial Numbers
Network Data
Switch Wiring
Which two kinds of PDUs are valid? (Choose two.)
Switched
Synchronized
Smart
Stationary
Static
set isis adjacencies
show isis adjacencies
show isis routes
show ospf routes
Reference: https://downloads.avaya.com/css/P8/documents/100180474 (990)
Which two statements about this upgrade process are true? (Choose two.)
ESXi hosts are upgraded all at the same time.
ESXi hosts are upgraded one after another.
One baseline group must be created using vSphere Update Manager to be used for all ESXi hosts.
Separate baseline groups must be created using vSphere Update Manager for each individual ESXi host.
Refer to the exhibit.
When a support engineer navigates to Orchestrator’s Rack View of an ACP 4200 system, the engineer notices that the V1-V6 slots on the right of the diagram are not populated. What could be causing this problem?
V1-V6 are used to represent Virtual Machines which are not present in this particular system.
V1-V6 are used to represent Vertical PDUs which are not present in this particular system.
V1-V6 are used to represent G450 Media Modules which are not present in this particular system.
V1-V6 are only used for ACP 100 systems.