Exam Code : CPIM-BSP
Exam Name : CPIM - Basics of Supply Chain Management
Vendor Name :
"APICS"
CPIM-BSP Dumps CPIM-BSP Braindumps
CPIM-BSP Real Questions CPIM-BSP Practice Test CPIM-BSP Actual Questions
killexams.com
CPIM - Basics of Supply Chain Management
https://killexams.com/pass4sure/exam-detail/CPIM-BSP
minimize transportation and material handling costs.
classify inventory according to the total amounts of inventory required.
optimize the amount of inventory for all classifications of inventory.
establish the degree of inventory control required.
Which of the following documents or records typically is required by accounting, receiving, purchasing, andthe supplier?
Bill of lading
Purchase requisition
Receiving report
Purchase order
Economic order quantity (EOQ) is best applied when the:
product is make-to-order.
product shelf life is short.
production process is continuous.
consumption rate is uniform.
Consolidating shipments and reducing the frequency of pickups help to reduce which of the following types of costs?
Warehousing and inspection
Import duties and processing
Total transportation
Capital
As a company moves from domestic to global distribution, it becomes increasingly critical to control which of the following distribution costs?
Warehousing
Material handling
Protective packaging
Transportation
The question below is based on the following information:
What is the average annual transit inventory in units?
55
110
548
658
a supplier until consumed.
the company who will consume the stock.
a joint trust set up for this purpose.
the carrier who transports the stock.
Which of the following factors is a primary consideration when contracting with a supplier?
Inventory levels
Order cost
Quantity discounts
Product quality
Which of the following differences must be taken into consideration when dealing with a global distribution system?
Culture
Cost
Carriers
Computer systems
Which of the following outcomes is a benefit of using a purchase requisition?
Improved accuracy of information
Assurance that delivery dates are met
Terms and conditions being followed
Which of the following statements about a distribution requirements planning system is true?
It is used only for service parts.
Priority is given to open orders.
Material requirements planning logic is used.
Gross requirements come from exploding the bill of material.
What is the order point when demand is 120 units per week, the lead time is 2 weeks, and safety stock is 60 units?
180
240
300
360