Latest CTAL-TTA-001 Practice Tests with Actual Questions

Get Complete pool of questions with Premium PDF and Test Engine

Exam Code : CTAL-TTA-001
Exam Name : ISTQB Certified Tester Advanced Level - Technical Test Analyst (CTAL-TTA-Syll2012)
Vendor Name : "iSQI"







CTAL-TTA-001 Dumps

CTAL-TTA-001 Braindumps CTAL-TTA-001 Real Questions CTAL-TTA-001 Practice Test CTAL-TTA-001 Actual Questions


killexams.com


iSQI


CTAL-TTA-001


ISTQB Certified Tester Advanced Level - Technical Test Analyst (CTAL-TTA-Syll2012)


https://killexams.com/pass4sure/exam-detail/CTAL-TTA-001


  1. A design review meeting

  2. An architect translating requirements into design

  3. Performing unit tests against design

  4. A test log showing code coverage achieved




Answer: A



Question: 59

Part 7 "Test Process & Incident Management"



As a technical test analyst, which documents would you typically create? 1 credit [K2]


  1. Test plan, test design, test cases and test log

  2. Test plan, test log, test design and test summary report

  3. Test script, test log, incident report and test design

  4. Incident report, test item transmittal report, test cases and test procedure




Answer: C



Question: 60

Part 7 "Test Process & Incident Management"



As a technical test analyst, you have found out during test case design that the design document is incomplete. Which is an example of a good way to communicate that problem in an email? 1 credit [K2]


  1. E-mail: “Until I have received an updated version of the design document, I will not do any work on the test design.”

  2. E-mail: “When will it be possible to receive the missing information? Test design is impeded by a lack of clarity here.”

  3. E-mail: “Here we go again. The developer gave us incomplete and ambiguous design specifications. Typical.”

  4. Do not communicate the problem, just log the delaying effect of the information problem and be ready to explain the delays to the test manager later.




Answer: B



Question: 61

Part 7 "Test Process & Incident Management"



As a technical test analyst, you are involved in a risk analysis session using the Failure Mode and Effect Analysis technique. You are calculating risk priorities. Which of the following are the major factors in this exercise? 1 credit [K2]


  1. Severity and priority

  2. Functionality, reliability, usability, maintainability, efficiency and portability

  3. Likelihood and impact

  4. Financial damage, frequency of use and external visibility




Answer: C



Question: 62

Part 7 "Test Process & Incident Management"



In which of the following test documents would you expect to find the preconditions to start executing a set of test cases? 1 credit [K2]


  1. Level test plan

  2. Test procedure specification

  3. Test design specification

  4. Master test plan




Answer: B



Question: 63

Part 7 "Test Process & Incident Management"



Defects are discovered through test analysis and design because… 1 credit [K2]


  1. the tasks involve extracting information from the test basis

  2. developers are involved in writing test cases

  3. the cost of fixing a defect will increase if found later on

  4. the author of the test basis will have made errors




Answer: A



Question: 64

Part 7 "Test Process & Incident Management"



The development manager asks you to identify suitable test coverage entry criteria for a component test. Which TWO of the following would you recommend as appropriate for entry criteria to a component testing phase? 2 credits [K3]


  1. 100% statement coverage

  2. No critical outstanding defects

  3. Test log available

  4. Code review completed

  5. Static analysis shows no major violations




Answer: D, E



Question: 65



Identify the most significant risk introduced by this approach to incident management. 3 credits [K4]


  1. Excel list may not be insynchronizationwith Word documents

  2. Low level of usability

  3. Spreadsheet/text files may not be complete

  4. Does not map to IEEE 1044




Answer: A