Question: 69
level of documentation
ure Mode and Effect Analysis (FMEA) sessions eability to requirements
functional testing ter test planning
esign techniques iews
on: 70
tion to risk, identify TWO other components of a testing strategy. 1 credit ntry and exit criteria for each test phase
training needs for the project resources est design techniques to be used performance indicators
est schedule
on: 71
erable attention will be given in this project to defining exit criteria and on reporting back on their status ombination of TWO exit criteria from the list would be best to use? 1 credit
Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains! 1 credit
High
Fail
Trac
Non-
Mas
Test d
Rev
Questi
In addi
The e
Test
The t
Test
The t
Questi
Consid .
Which c
Total number of defects found
Percentage of test cases executed
Total test effort planned versus total actual test effort spent IV. Defect trend (number of defects found per test run over time
(i) and (ii)
(i) and (iv)
(ii) and (iii)
(ii) and (iv)
Question: 72
Incorrect form of Logic coverage is:
Statement Coverage
Pole Coverage
Condition Coverage
on: 73
ould be a test approach regarding the test design techniques to be applied that would fit an item with th risk? 2 credits
mponent testing: decision testing; System testing: exploratory testing mponent testing: decision testing; System testing: decision table testing mponent testing: statement testing; System testing: equivalence partitioning mponent testing: statement testing; System testing: decision table partitioning
on: 74
f the following would you expect to see in the master test plan? 1 credit
escription of how the test cases are cross-referenced to requirements in the test management tool. etailed identification of the resources that will carry out structural testing in the first iteration.
est approach that will be applied at system integration testing.
of the names of the testers who will carry out the performance testing for the final iteration.
Path Coverage
Questi
What w e
highest
Co
Co
Co
Co
Questi
Which o
A d
A d
The t
A list
Question: 75
Tests are prioritized so that:
You shorten the time required for testing
You do the best testing in the time available
You do more effective testing
You find more faults
Question: 76
Topic 13, Mix Questions
What benefits do static analysis tools have over test execution tools?
Static analysis tools find defects earlier in the life cycle.
Static analysis tools can be used before code is written.
Static analysis tools test that the delivered code meets business requirements.
Static analysis tools are particularly effective for regression testing.
on: 77
ing the test environment set-up and identifying any required infrastructure and tools are a part of which Implementation and execution
Analysis and Design
uating the Exit Criteria and reporting Closure Activities
on: 78
f the following are valid reasons for adopting a different life cycle (from the V model), for increments year? 2 credits
do not have a clear understanding of the requirements from a customer perspective.
ee the risk of delivering requested functionality late as being higher than the risk of delivering a lower q
o not have a budget for additional regression testing which is needed to ensure that existing functionali mpromised by future iterations.
company test strategy does not fit well within the V life cycle model. nd (ii)
nd (iv)
Questi
Design phase:
Test
Test
Eval
Test
Questi
Which o after
the first
i) We
We s uality
product.
We d ty is
not co
The
(i) a
(i) a
(ii) and (iii)
(ii) and (iv)
Question: 79
Topic 2, Scenario 2 "Reviews"
A software development organization wants to introduce some specific improvements to its test process. Currently,
most of their testing resources are focussedon system testing.
They are developing embedded software, and do not have a simulation environment to enable them to execute software modules on the development host. They have been advised that introducing inspections and reviews could be the most appropriate step forward.
Which of the following is an example of testing as part of the requirements specification phase? 1 credit
A requirements review meeting
A business analyst eliciting requirements
Performing acceptance tests against requirements
A test report showing requirements coverage
on: 80
the Risk Priority Number for risk item number 2? 2 credits
Questi
What is
16
2
1
63