Question: 130


Regional Priority credits are new to LEED 2009 and are made available to the project for:


  1. Achieving the highest threshold level of the credit

  2. The zip code of the geographic location of the project

  3. Ensuring all enviornmental concerns associated with energy usage for the project location are achieved

  4. Determining all local enviornmental issues are achieved as identified by the project team


Answer: B


Question: 131


The LEED project boundary is defined as:


  1. The same as the site boundary

  2. The porton of the site that encompasses only the building and hardscape areas

  3. The boundary description that is submitted for certification

  4. The same as the attendance boundary


Answer: C


Question: 132


The 2009 LEED Rating System vest suited for an office complex where the owner will occupy 60% of the building would be:


  1. LEED for Core & Shell

  2. LEED for Existing Buildings: Operations & Maintenance

  3. LEED for Commercial Interiors

  4. LEED for New Construction and Major Renovations


Answer: D


Question: 133


The minimum FTE requirement per Minimum Program Requirements (MPRs) for LEED Certification is:


  1. 25 FTE

  2. 1 FTE

  3. 10 FTE

  4. 1 FTE per 100 square feet


Answer: B


Question: 134


A popular program for comparing the energy performance of multiple buildings:


  1. ENERGY STAR

  2. EPAct 1992

  3. ASHRAE 90.1-2007

  4. ASHRAE 90.1-2004


Answer: A


Question: 135


What is unique about the Innovative Performance requirement for the Innovation in Design credit?


  1. It is not applicable to existing or similar stragies in the LEED rating system

  2. It is available for achieving the next incremental theshold of the credit

  3. It is available only for prerequisites

  4. It is available only for existing or similar credit strategies


Answer: A


Question: 136


The major consideration when developing a sustainable project budget:


  1. Final contractor bids

  2. Life Cycle Costs

  3. Construction hard costs only

  4. Triple Bottom Line


Answer: B


Question: 137


The EPAct 1992 water standard excludes which types of fixtures and equipment?


  1. Bidets

  2. Dishwashers

  3. Lavatory faucets

  4. Water closets


Answer: B