Latest PSPO-I Practice Tests with Actual Questions

Get Complete pool of questions with Premium PDF and Test Engine

Exam Code : PSPO-I
Exam Name : Professional Scrum Product Owner I
Vendor Name : "Scrum"







Scrum


PSPO-I


Professional Scrum Product Owner I


https://killexams.com/pass4sure/exam-detail/PSPO-I



f the following best describes the Scrum Pillar "Transparency"? hole process should be visible to everyone.

rocess should be visible to the key stakeholders.

ificant aspect of the process must be visible to those responsible for the outcome.


r: C ation:

gnificant aspects should be visible, not all the details. The process does not to be visible to ody in the world.

on: 95


oduct Backlog is baselined before the Sprint 0.


r: A ation:

atement is wrong because the Product Backlog is not baselined (fixed) and there is no Sprint 0 in Scrum.


Question: 94


Which o

  1. The w

  2. The p

  3. Sign


Answe Explan Only si everyb

Questi


The Pr

  1. False

  2. True


Answe Explan This st


Question: 96


Which of the following are Scrum Values?

  1. Respect

  2. Focus

  3. Inspection

  4. Collaboration

  5. Commitment

  6. Maximize Value

  7. Courage

  8. Openness



Answer: A,B,E,G,H
Explanation:

The Scrum Values are: commitment, courage, focus, openness, and respect.



Question: 97


Self-management means, that the team can decide which Scrum events are needed.

  1. False


    r: A ation:

    um events listed in the Scrum Guide are mandatory.


    on: 98


    ing Scrum, there can be a maximum of one release per Sprint.


    r: A ation:

    ed, you can have more than one release per Sprint.


    on: 99


    crum accountability (role = outdated term) is owning the Sprint Backlog? roduct Owner

    crum Master evelopment Team

  2. True


Answe Explan All Scr

Questi


Follow

  1. False

  2. True


Answe Explan If need

Questi


Which S

  1. The P

  2. The S

  3. The D




Answer: C
Explanation:

To "own" something means, that you are accountable for it.



Question: 100


Which of the following are mandatory in Scrum?

  1. Do Sprint Plannings.

  2. Do Daily Scrums.

  3. Have a Product Owner.

  4. Use Story Points.

  5. Use User Stories.




Answer: A,B,C
Explanation:


on: 101


rum Master can decide which Scrum Artifacts are required in the Scrum project.


r: A ation:

efines which Artifacts are required in all Scrum project, not the Scrum Master.


on: 102


budgeting done in a Scrum Project? lly budgeting is done every Sprint.

m doesn’t need the team to care about budget.

geting is done based on the Product Backlog as a baseline.


r: A


on: 103


laboration between the Developers and the Product owner is very important for the product .

It is not mandatory to use User Stories or Story Points in Scrum, but it is recommended.


Questi


The Sc

  1. False

  2. True


Answe Explan Scrum d

Questi


How is

  1. Idea

  2. Scru

  3. Bud


Answe Questi The col

Which of the following is the least productive way for the Scrum Master to improve this collaboration?

  1. The Scrum Master should act as a go-between for them.

  2. The Scrum Master should teach them techniques to improve it.

  3. The Scrum Master should suggest new collaboration tools.




Answer: A
Explanation:

Acting as a go-between is not a sustainable solution!



Question: 104


Which Scrum Event can be compared to the use of a "lessons learned meeting"?

  1. The Sprint Review.

  2. The Daily Scrum.

  3. The Sprint Retrospective.

  4. The Sprint Planning.



ation:


etrospective is about discussing the way work was done and to find ways to improve it.


on: 105


oduct Backlog should have just enough detail.


r: B ation:

oduct Backlog will evolve. The amount of information will grow and change.



Answer: C Explan Sprint R

Questi


The Pr

  1. False

  2. True


Answe Explan The Pr