ICorr-PFP-Coating-Inspector-Epoxy-L2 Exam Information and Outline
ICorr Passive Fire Protection (PFP) Coating Inspector - Epoxy Level 2
Syllabus Update Checked on: September 7, 2026
ICorr-PFP-Coating-Inspector-Epoxy-L2 Exam Syllabus & Study Guide
Before you start practicing with our exam simulator, it is essential to understand the
official ICorr-PFP-Coating-Inspector-Epoxy-L2 exam objectives. This course outline serves as your roadmap.
The information below reflects the 2026 syllabus defined by
ICorr.
Below are complete topics detail with latest syllabus and course outline, that will help you good knowledge about exam objectives and topics that you have to prepare. These contents are covered in questions and answers pool of exam.
Introduction: Fire and Types of Fire, Explosion Hazards, Fire Mitigation, why use PFP
Introduction to PFP: Types of PFP coatings, Epoxy, Cementitious, Dry Fit, Duplex
PFP of Steel Structures: Open section, Closed Section, Coatback Areas, Divisions, Process Vessels, Storage Vessels, Decks and Bulkheads
Classification Society Type Approvals: Main Society Approvals, Fire Test Curves, Other Types of Approval
PFP Materials and Systems: Product Development, Testing, Approval
Overview of Epoxy Degradation Mechanisms: Pre-fire Durability, Survivability in a Fire
Epoxy PFP Product Manufacturer Manual: Contents, Application Characteristics, Updates
Examples of PFP Application Defects: What to look for, Contamination Effects, Other Issues
Inspection Equipment: Calibration, Adjustment and Verification
Reporting and Record Keeping: Manual and digital reports
Health and Safety: Work Practices and Procedures, CDM, Method Statements, COSHH, etc.
Role of the PFP Coating Inspector
Pre-job Meeting: Specification, Inspection Plan, Responsible, Accountable, Consulted, and Informed (RACI) Chart, Load List, Level of Testing
Before Going on Site: Safety Data Sheets, Technical Data Sheets, Health & Safety Data Sheets, Risk Assessments, Manufacture’s Cards, Site Specific H&S, Authorisations
Personal Protective Equipment
On-site Tasks: Relationships – supervision & work team, Test & Inspection Equipment Checks, PFP Material Storage Checks,
Monitoring Work: Surface Preparation, Primer Coat, PFP Coat – mixing process, Daily Report, PFP Post-cure Inspection, Final Inspection