My cart:
0 items
  • Cart is Empty
  • Sub Total: $0.00

AMPP-CCI2 Exam Format | AMPP-CCI2 Course Contents | AMPP-CCI2 Course Outline | AMPP-CCI2 Exam Syllabus | AMPP-CCI2 Exam Objectives

AMPP-CCI2 Exam Objectives | Course Outline | Syllabus


AMPP-CCI2 Exam Information and Outline

Concrete Coating Inspector (Level 2) - CBT



AMPP-CCI2 Exam Syllabus & Study Guide

Before you start practicing with our exam simulator, it is essential to understand the official AMPP-CCI2 exam objectives. This course outline serves as your roadmap, breaking down exactly which technical domains and skills will be tested. By reviewing the syllabus, you can identify your strengths and focus your study time on the areas where you need the most improvement.

The information below reflects the latest 2026 course contents as defined by AMPP. We provide this detailed breakdown to help you align your preparation with the actual exam format, ensuring there are no surprises on test day. Use this outline as a checklist to track your progress as you move through our practice question banks.


Below are complete topics detail with latest syllabus and course outline, that will help you good knowledge about exam objectives and topics that you have to prepare. These contents are covered in questions and answers pool of exam.





Test Name: Concrete Coating Inspector Level 2 Theory Exam
Test Code: ConcreteCtgsIn2
Total Seat Time: 2 Hours (120 minutes)
Number of Questions: 100
Format: Computer-Based Testing (CBT)

1. Ambient Condition (5% - 10%)
2. Coating Application (5% - 10%)
3. Coating Defect (1% - 5%)
4. Coating Inspection (25% - 30%)
5. Coating Material (5% - 10%)
6. Concrete Construction (10% - 15%)
7. Concrete Failure (5% - 10%)
8. Health & Safety (1% - 5%)
9. Project Specification (10% - 15%)
10.Standards (10% - 15%)
11.Surface Preparation (5% - 10%)

1. Ambient Condition

- Relative humidity measurement and effects on coating application
- Dew point calculation and psychrometric charts
- Surface temperature vs. ambient temperature differentials
- Wind speed and its impact on application
- Environmental controls (dehumidification, heating, ventilation)
- Acceptable ranges per standards (e.g., minimum/maximum temperatures)
- Moisture in concrete substrate (vapor transmission, relative humidity in slab)

2. Coating Application

- Spray application techniques (airless, conventional, plural-component)
- Brush and roller application methods for concrete
- Thickness control (wet film thickness gauges, application rates)
- Plural-component spray systems for high-build coatings
- Curing mechanisms (air dry, chemical cure, moisture cure)
- Recoat windows and intercoat adhesion
- Application on vertical/overhead concrete surfaces
- Specialized techniques for thick-film linings and elastomeric coatings

3. Coating Defect

- Blistering (osmotic, solvent entrapment)
- Cracking (mud cracking, checking, alligatoring)
- Pinholes and holidays in thick coatings
- Sagging, runs, and curtain defects
- Delamination and intercoat disbondment
- Fisheyes and cratering from contamination
- Chalkings, fading, and discoloration
- Failure due to substrate moisture or pH issues

4. Coating Inspection

- Pre-application inspection (hold points)
- In-process monitoring of application
- Post-application testing (dry film thickness, adhesion, holiday detection)
- Visual inspection standards (e.g., gloss, color, uniformity)
- Documentation and reporting (daily logs, non-conformance reports)
- Inspection plan development and execution
- Use of destructive vs. non-destructive tests
- Quality control vs. quality assurance roles

5. Coating Material

- Generic coating types (epoxies, polyurethanes, polyureas, cementitious)
- Polymer linings (vinyl ester, novolac)
- Moisture-cure urethanes and penetrating sealers
- High-build and thick-film systems for immersion
- Primers, intermediates, and topcoats for concrete
- VOC-compliant and low-odor formulations
- Material storage, shelf life, and mixing ratios
- Safety data sheets (SDS) interpretation

6. Concrete Construction

- Concrete mix design and additives
- Formwork and placement techniques
- Curing methods (wet cure, membrane cure)
- Reinforcement (rebar placement, cover)
- Joints (construction, expansion, control)
- Common concrete elements (slabs, walls, beams, columns)
- Post-tensioning and prestressing basics
- Repair methods prior to coating

7. Concrete Failure

- Carbonation and chloride ingress
- Alkali-silica reaction (ASR)
- Freeze-thaw damage and scaling
- Sulfate attack and chemical degradation
- Cracking (plastic shrinkage, drying shrinkage, structural)
- Spalling and delamination
- Corrosion of embedded reinforcement
- Abrasion and impact damage

8. Health & Safety

- Personal protective equipment (PPE) for coating work
- Confined space entry procedures
- Hazardous materials handling (isocyanates, solvents)
- Ventilation requirements during application
- Fall protection and scaffolding safety
- Respiratory protection programs
- Hazard communication and SDS
- Emergency response and first aid

9. Project Specification

- Interpretation of coating specifications
- Hold point inspections and approvals
- Deviation requests and non-conformance handling
- Submittal review (product data, mock-ups)
- Contractual requirements and responsibilities
- Pre-job conference agendas
- Specification sections relevant to concrete coatings (e.g., 099600)
- Change orders and field modifications

10. Standards

- AMPP/NACE standards for concrete coatings
- SSPC-SP 13/NACE No. 6 Surface Preparation of Concrete
- ASTM standards (e.g., D4258 moisture testing, D7234 adhesion)
- ICRI Technical Guideline No. 310.2R Selecting and Specifying Concrete Surface Preparation
- ISO standards for coatings and inspection
- ACI standards for concrete repair and protection
- Holiday detection standards (NACE SP0188)
- Adhesion testing (ASTM D7234, D4541)

11. Surface Preparation

- Mechanical methods (abrasive blasting, scarification, grinding)
- Acid etching and neutralization
- Water jetting (hydroblasting) for concrete
- ICRI Concrete Surface Profile (CSP) chips and standards
- Removal of contaminants (oil, grease, laitance)
- Bug hole and void filling/repair
- Moisture testing (calcium chloride, RH probes)
- Cleanliness verification (dust, pH testing)

AMPP-CCI2 Exam Questions Detail

We are the best Exam Questions Provider

With a long list of thousands of satisfied customers, we welcome you to join us.

All CertificationsAll Vendors